P9 Pumping Station
Client: Dead Sea Works.
Year: 2017-2020
Location: Dead Sea
Description:
New Pumping Station, P-9, is designed to meet Dead Sea Works Ltd (DSW) demands for sea water level at the beginning of 2020 for DSW south region operational evaporation ponds.
The new pumping station shall consist of a Jetty, Pump Table, Abutment, Link Bridge, Pumps & 3km length of 3m diameter pipelines, Control station, Power room, etc. A full pumping.
The new pumping station is located at a site 3kms north of the existing pumping station P88.