Marina Ashdod
Client: The Blue Marina
Year: 1.6.1996 – 30.6.1998
Location: Ashdod
Description: Construction of 500 berths marina from pre cast
concrete elements positioned on driven concrete
piles.
Special features: Beach rock excavation using under water
blasting. Sand dredging-150,000 m3
Offshore driving of 1000 pre cast pre stressed concrete piles 35-50 cm dia. Placing of 1500 pre cast concrete capping beams and deck elements.
Construction of mooring system including 125 underwater anchor piles.