Hadera Desalination Plant
Client: H2ID/Solel Boneh
Year: 2007-2009
Location: Hadera
Laying of intake pipes from the sea into the desalination facility.
Installation of three HDPE pipes in 1.8 m dia. under seabed in Hadera at a distance of 1500 m from the beach. In addition, laying of GRP pipes in the same dia. from the beach to the plant. The work included construction of concrete saddles and intake heads, submarine works – connecting and assembling, at a depth of 18 meters. Assembling and adapting the pipe line to different heights.