E.A.P.C – Pipelines Dismantling & Launching
Client: Water pipeline company Ashkelon Eilat
Year: 03/22/10 – 06/06/11
Location: Port of Ashkelon
The work included:
Dismantling and removing two sections of underwater steel pipelines D- 32 " used for transporting crude oil and replacing it with 2 new pipes section at the Lengths of: 1,100 m and 500 m.
Connection Method: Dry underwater welding at depths of 28 – m and 32 – m. using habitat