Bridge section removal

Rutenberg Power Plant

Client: Israel Electric Co..
Year: 2023
Location: Ashkelon Coal Jetty

Description:

Clearance and removal of parts of the pier that were damaged and located at and above the water line and those on the top of the bridge (i.e all debris on the surface or seabed).

Including Removal of the collapsed crane from the water and seabed (total weight 1200mt) & Removal of the collapsed bridge sections from the seabed (about 60m in length and a weight of an estimated 800mt).