Ashkelon Mooring Pile Installation

Client: Israel Electric Co.. Year: 2020-2021 -Ongoing Location: Ashkelon Coal Jetty

Description:

Fabrication, Supply and Installation of a new Steel Pile Mooring Dolphin System for Coal Carriers including the Crown Beam Cap, bollards and a Fenders. The Mooring Dolphin consists:

  • Total length 64 meters
  • Diameter 2.8 meters
  • Steel quality X52 and X70
  • Wall thickness varies from 34mm to 75mm.
  • Weight 213 tons.
  • Final height above sea level 4.4 meters.
  • Inserted at the bottom of the sea to 32 meters.
  • Environmental and soil data: Open sea, distance from shore approx.1.8km